Commercial Solar + Storage Project

Optimizing On-Site Solar Energy Usage

Project Overview

Location: Southeast Asia
System Capacity: 2MW PV + 1MWh BESS
Application: Commercial Solar Optimization
Client Type: Industrial Facility / Factory

Project Challenges

Mismatch between solar generation and consumption
High electricity cost during peak hours
Limited ability to utilize excess solar energy

Solution Architecture

On-site solar + BESS integration
EMS-based load and energy optimization
Peak shaving and energy shifting

Technical Highlights

Smart energy scheduling
Load-adaptive control system
Modular storage design

Project Results

40% reduction in electricity cost 
Increased solar self-consumption
Reduced grid dependency
Faster ROI